Silson has an in-house ADT 7900 dicing saw and has capability to dice 76.2 mm, 100 mm and 150 mm wafers to meet your requirements!

We are able to supply the diced wafers either ‘in tact’, still on dicing tape, packed in a wafer shipper, and you can peel off the chips as you need them. Alternatively we can package individual frames for you.

Standard wafers we dice are:

1. blank, uncoated silicon wafers

2. silicon nitride coated silicon wafers

3. metal coated wafers, with 10nm Ti + 100 nm Au being the most popular coating

Standard designs include any combination of the following parameters:

Wafer diameter:76.2 mm
100 mm
150 mm
Wafer thickness:200 ยตm
381 ยตm
525 ยตm
Frame size:4.0 x 4.0 mm
5.0 x 5.0 mm
7.5 x 7.5 mm
10.0 x 10.0 mm
Coating:none (uncoated silicon)
silicon nitride (standard is 100 nm SiRN)
gold Au (with titanium Ti adhesion layer)
other metal coatings available upon request
(see our coated membranes page for details)

We also have the capability to dice membrane wafers due to our saw having a submersion dicing option, which allows for precisely cut squares without the risk of breaking membranes during the process.

Don’t hesitate to get in touch with your dicing requirements!

Contact us

Latest News from Silson

๐ŸŽ‰ An exciting announcement! ๐ŸŽ‰

Silson is thrilled to have been named as one of the Highly Commended businesses in the 2024 Made in the UK, Sold to the World Awards by the Department for Business and Trade in the Manufacturing, Advanced Manufacturing & Construction category! A huge thanks to the DBT for this recognition.

The awards celebrate the international sales success of small-medium businesses across the UK and provide a stepping stone for further growth and opportunity, you can read more about the awards at this link!

You can read the full press release here!

Contact us

Latest News from Silson

This year, Silson has installed a 39.12 kW system of Solar PV on the roof of our building, to offset a large proportion of our energy usage!

In just 6 months we have generated 26 Mwh, which equates to an estimated 5.2 tonnes of CO2 saved!

Huge thanks to the team at KS Connexions for the efficient installation and support since.

We received a grant for the installation from the Coventry and Warwickshire Green Business Programme. The Coventry and Warwickshire Green Business Programme is partly funded by the European Regional Development Fund and is being delivered by Coventry City Council, Coventry University, and Coventry University Enterprises Ltd.

 

Contact us

Latest News from Silson